Columbia City's Neighbor News |
Combined Sewer Overflows — community meeting
Seattle Public Utilities (SPU) will hold a public meeting Jan 20th, 6-8 pm, at Lakewood/Seward Park Community Club (4916 S Angeline) to present alternative sites for Genesee Combined Sewer Overflow (CSO) Reduction Projects.
SPU is working to improve the health of Lake Washington by reducing Combined Sewer Overflows (CSOs). During heavy rain, stormwater and sewage may overflow into the lake. SPU has identified and will present at this meeting the locations for projects to reduce CSOs in your neighborhood.
Basins 40/41: the parking lot along Lake Washington Blvd. between 48th & 49th Ave. S. (property owned by Seattle Parks Dept.)
Basin 43: one of three possible locations
- open park space at S. Alaska St. & 54th Ave. S. (owned by Parks Dept.)
- In 54th Ave. S. Right-of-Way between S. Angeline St. and S. Alaska St.
- Parking lot along Lake Washington Blvd. at 53rd Ave. S. (owned by Parks
Dept. and added to the list based on community input)
Questions? Contact Genesee Area CSO Reduction Project at 826-4767 or vog.elttaeS|OSCG_UPS#vog.elttaeS|OSCG_UPS. Or visit seattle.gov/cso.
— |
vog.elttaes|OSCG_UPS#nagaE ekiM |
Comment on this item
post your own Wikli item |